The approval for access, that’s the job, means the Traditional Owners are way in front of the Main Crew, and unless we take time to go back, they never get to see the actual Operation.
The basis of oil and gas exploration, is called seismic exploration, and that requires energy to enter the ground, which reflects or bounces back to the surface from substrata below. With processing, you end up with a 2 dimensional time slice below the seismic line, which ties to geological formations – or that’s the idea anyway! It’s the first step to finding a location to drill.
The energy is generated by the Vibrator, a large 4×4, 6×6 or tracked vehicle that lowers a large metal plate onto the ground, and a hydraulic pump drives a ram that pounds onto the plate, which in turn transfers the energy into the ground.
The energy reflecting back to the surface is noted by geophones. The geophone is a magnet suspended in a coil of wire, coupled to the ground by a spike, and when the magnet jiggles up and down by the returning seismic waves of energy, it creates an electric current that travels down the wire.
There are 10 or 12 geophones in series, around a metre to 2 apart on the ground. The geophone set is called a String, and each String clips onto a major cable that has around 150 active strings attached to it at all times.
The cable connects into a recording truck, that records all the electrical signals coming in from the strings. There could be 5 or 6 kms of strings alive at any one time.
The vibrator drives long the seismic line, stopping at every station, 40metres or so apart, to enter the energy.
The Recording Truck sends out a radio signal that starts the energy process, which takes a few seconds, then the Vib driver raises the pad and drives the 40m to the next station.
Meanwhile the active stations of geophone strings are switched forward, also one station at a time.
The used strings at the back of the cable are disconnected and collected up by a handful of staff called Juggies, and put onto woopies or utes, that drive past the vibrators upto the front of the active part of the cable and more Juggies clip them onto the cable and stamp the spikes into the ground. The ferry utes then go back to repeat the process.
It’s a huge logistical process that costs $5000 to $10,000 per hour.
The seismic lines are just access pathways for the crew to drive back and forth with the cables and for the vibrators to drive from station to station. Surveyors have to drive along before them to mark out the stations, and before them the earthmoving do their part, but NOBODY does anything until the Traditional Owners have given their approval.
As you can see, there is minimal environmental impact, the crew drives around bushes and trees, wending their way through the scrub.